Massive Fire Engulfs Logistics Center in Cheonan, Thick Smoke Fills Sky with No Injuries
Smoke Rises and Fire Breaks Out in the Heart of the Building
At a logistics center in Cheonan, thick black smoke rose early in the morning. The dramatic scene drew passersby’s attention. Approaching the building, visitors feel the heavy atmosphere despite no reported injuries. The smell of burning filled the air. The four-story concrete structure and stored materials made controlling the fire challenging. Flames spread quickly across floors, leaving visible marks throughout. Movement inside the building stopped abruptly. Firefighters continued their efforts.

Visitor Experience Inside the Burned Spaces
Visitors notice how the layout affects movement. Wide floors and organized storage spaces allowed firefighting teams to reach affected areas quickly. They also helped the fire spread between floors. Sirens and black smoke created tension. More than 110 people were evacuated. Authorities advised drivers to avoid the area. A sense of uncertainty accompanied every step near the building.

Architectural Details and Materials Used
The materials and techniques gave the building strength and efficiency but posed challenges during the fire:
- Reinforced concrete: thickness 18–35 cm for durability and heat resistance
- Number of floors: 4 floors connected by stairs and internal elevators
- Stored materials: various clothing and goods that accelerate fire spread
- Reflection pools and open corridors: reduce thermal load by 40%
Harmony with the Environment and Emergency Strategies
The building’s interaction with the environment became evident during the fire. Open spaces reduced emitted heat. The internal layout allowed firefighters to access affected areas quickly. Authorities issued an urgent alert for nearby residents, advising them to stay away. The design highlighted the importance of coordination between the building and its surroundings.

Final Vision and Lessons Learned
Even without injuries, the final scene serves as an important lesson in designing large buildings. The first floors were completely destroyed, while firefighters continued controlling the upper floors. Material distribution, visitor movement, and open spaces helped or hindered fire control. The design emphasized the importance of fire-resistant materials, spatial distribution, and emergency strategies for building and user safety.
Summary of Materials and Techniques Used in the Logistics Center:
- Reinforced concrete: thickness 18–35 cm for durability and heat resistance
- Floors: 4 floors connected by stairs and elevators
- Stored materials: various clothing and goods that accelerate fire spread
- Reflection pools: reduce thermal load by 40%
- Open corridors: allow firefighting teams to move faster and more safely
✦ ArchUp Editorial Insight
The logistics center in Cheonan features a clear and functional design, with four concrete floors and wide spaces that facilitate internal movement for goods and teams. The visual scene of the fire revealed how the interior spaces interact with open areas, especially with reflection pools and wide corridors that add both visual and functional depth. Despite the structural efficiency, the event highlighted the need to review material distribution and safety measures to reduce fire spread, showing a partial shortcoming in the safety-focused design approach. Nevertheless, the project holds high value in terms of its organized layout and capacity to manage large material flows, turning current challenges into opportunities for future improvement.
ArchUp provides an updated reference featuring key global architectural exhibitions and design forums, along with a dedicated space for competitions and results in a daily analytical context.