AR New into Old awards 2027

The Architectural Review is accepting completed adaptive reuse projects for its 2027 award. The architectural question behind the call is consequential: how can a building acquire a different purpose while retaining the useful qualities of what already exists? This is recognition for built work, rather than an invitation to design a speculative conversion.
Entry essentials
| Organizer | The Architectural Review / emap |
| Eligible work | Projects completed within five years that demonstrate a change of programme |
| Early entry | 15 January 2027; approximately USD 456 plus applicable VAT |
| Standard entry | 16 January–12 February 2027; approximately USD 522 plus applicable VAT |
| Late entry / final date | 13–26 February 2027; approximately USD 587 plus applicable VAT |
| Recognition | Shortlisted building studies in the June 2027 issue; no cash prize stated in reviewed call |
USD figures are estimates using 1.30735 USD per pound sterling, reported by The Rates API for 23 November 2026. Payment remains subject to the organizer’s sterling pricing, taxes and the payment provider’s conversion.
Submission and judging
Prepare two anonymous A2 PDF boards, including a plan, section, photographs and roughly 250 words, plus six credited JPEG images. The entry page specifies a 12MB file limit and a minimum image dimension of 480 × 480 pixels. Editors select six projects for independent critical visits before an international panel chooses the winner.
Conditions and inconsistencies to check
A straightforward renovation without a change in use does not satisfy the stated programme criterion. The 2027 jury is still being confirmed; names currently illustrated on the judges page belong to 2025. Do not attribute those names to this edition.
The official pages reviewed give dates without a confirmed closing hour. A secondary listing labels a February cutoff as BST, so we have not adopted that timezone claim. The requested high-resolution images and the small stated pixel minimum should also be read carefully: the minimum is not a sensible production target for print. Confirm export quality, file-limit interpretation and publication permissions before final upload.
ArchUp assessment
Adaptive reuse is most convincingly explained through decisions about retention and removal. A strong entry should make the original structure readable, then show why each intervention was necessary. The persuasive question is not whether old and new materials look different, but whether their relationship enables a useful new pattern of occupation.
We would examine a comparative section as closely as the final photographs. Changes in circulation, daylight, escape routes and accessibility often determine whether a conversion works. When these issues disappear behind a carefully composed interior image, an entry risks confusing visual coherence with the more demanding task of adapting a real building.
Environmental claims need an appropriate scale of evidence. Keeping a facade while replacing most of the structure is a different proposition from extending the life of an entire frame. Applicants can strengthen their account by identifying what was retained, reused and replaced, and by distinguishing measured performance from design intentions. This is an editorial recommendation, not an additional organizer requirement.
The critical site visit is a meaningful feature of the process because architecture can be assessed in use rather than exclusively through presentation boards. Nevertheless, entrants should weigh the fee and preparation time against the specific editorial exposure offered. Recognition does not constitute a new commission or guarantee a financial return.
The call is a good fit for practices with completed, well-documented changes of use. Its most interesting submissions should explain what became possible for occupants through adaptation, including compromises and constraints. Honest accounts of the work are more useful to architectural practice than treating every retained fragment as an automatic sustainability achievement.
Reviewed 24 November 2026. Sources: entry rules; jury status; conversion reference. Featured image: screenshot of the The Architectural Review announcement supplied for this article.
Indicative countdown to the closing date
This planning countdown targets the start of 2027-02-26 in UTC, not an official closing hour. No confirmed cutoff time is published in the reviewed call. Submit before the deadline day and confirm timing with the organizer.






