استكمال مجمع المكاتب المرن والمعياري Liander Westpoort في أمستردام

Complete the flexible and modular Leander Westpoort office complex in Amsterdam

Home » News » Complete the flexible and modular Leander Westpoort office complex in Amsterdam

De Zwarte Hond has completed an office complex, made of wood,

based on a circular and sustainable approach in Noordzeeweg, Amsterdam-Westpoort, Netherlands.

Named Liander Westpoort, the new complex consists of three buildings designed for the Dutch energy company Alliander.

According to the principles of circularity and flexibility, the collection, made of wood, consists

From office building, workshops, warehouses, testing facilities, teaching buildings and car parks,

Covering a total of 21,000 square meters for 700 employees.

De Zwarte Hond, along with clients Alliander, IMd, Copper8 and DGMR, has formulated

Sustainability ambitions resulting in high flexibility, scalability and modularity.

 

Complete the flexible and modular Leander Westpoort office complex in Amsterdam
Complete the flexible and modular Leander Westpoort office complex in Amsterdam

 

The office used sustainable materials, especially wood where possible,

The team avoided using harmful materials such as glue,

polyurethane foam or sealant as much as possible during construction.

The office building and training facilities are constructed entirely of wood,

which was intended to be flexible and to create a healthy working environment.

Project Description

Thanks to its detachable frame structure, the car park building can grow or shrink.

The facades are made of weather-resistant Corten steel, making the regional office resilient for the future.

 

Complete the flexible and modular Leander Westpoort office complex in Amsterdam

 

Industrial architecture

The team arranges the buildings and interstitial spaces with a rhythmic alternation on the plot,

Like a bar code, with the office building as a rising accent, it can see from A5.

With all parts of the program receiving the same attention,

The work premises and storage areas have designed with the same care as the office building.

Together they form a powerful ensemble that evokes memories of industrial architecture’s heyday.

Meetings and interactions

Inside the office building, the interior has a large lobby and wooden central staircase,

creating an environment conducive to meetings and interactions.

A unique ‘wandering staircase’ connects each floor to a different location,

providing an exciting and adventurous route through the office.

 

Complete the flexible and modular Leander Westpoort office complex in Amsterdam

 

The office complex as an example of sustainability

Demonstrating an “example of sustainability”, the building is gas-free and energy-neutral thanks to 3,435 square meters of solar panels and thermal energy storage.

Because the building is made of wood, the team stored 560 tons of carbon dioxide.

In addition, the team paid great attention to cost reduction and material reuse, which contributed to the circular economy.

 

For more architectural news

Further Reading from ArchUp

  • Building an educational center for children with a green circular roof

    New Zealand architecture firm Smith Architects has built an early learning center with a circular green roof in the heart of Mairangi Bay in Auckland, New Zealand.  Design FeaturesThe 729 square meter building, named after Kakapo Creek Children’s Park,accommodates up to…

  • Al-Khobar on the Rise Construction Begins on Fahd Tower Amid Rapid Urban Growth

    In the heart of a city undergoing visible transformation, construction has officially begun on the Fahd Tower in Al-Khobar. This marks a new architectural landmark within a wave of development reshaping the urban landscape of this coastal city.A New Project…

  • Arborescence Apartments / WY-TO architects

    © Juan Cardona + 43 Area Area of this architecture project Area:  8200 m² Year Completion year of this architecture project Year:  2024 Photographs Manufacturers Brands with products used in this architecture project Manufacturers:  AutoDesk, Schüco, Woodenha Industries Lead Architects:…

  • Emerging Architectural Identity at Faena Resort on Shura Island, Red Sea

    on-site images reveal steady progress at Faena Resort on Shura Island, part of the wider Red Sea development. Structural forms and spatial layouts are becoming visible, offering a clear sense of the resort’s evolving architectural language.Context and SettingShura Island, at…

  • Natede – Technology, plan, and nature against air contamination

    Natede is a characteristic air purifier with a basic and excellent plan imbued with very good quality innovation.Natede permits you to truly take a full much needed refresher.This air purifier kills 93% of fumes and gasses and close to 100%…

  • RIBA International Prize 2024 goes to ‘radical housing’ in Barcelona

    The RIBA International Prize 2024 has been announced, with Modulus Matrix: 85 Social Housing in Cornellà, designed by Peris + Toral Arquitectes in Barcelona, crowned as the overall winner. A longlist of 22 buildings, all RIBA International Award for Excellence…

Leave a Reply

Your email address will not be published. Required fields are marked *