Home » News » King Abdullah International Airport: 77% Complete

King Abdullah International Airport: 77% Complete

King Abdullah International Airport
King Abdullah International Airport .. 77% Complete

King Abdullah International Airport: New Gateway to the World

The new King Abdullah bin Abdulaziz International Airport project in Jazan continues to make remarkable progress. Engineer Ali Masrahi, CEO of the Second Airports Cluster Company, confirmed that the completion rate has reached 77%.

The project spans an area of ​​48 million square meters and is a fundamental pillar for enhancing air connectivity and supporting economic and tourism development in the region.

Prince Mohammed bin Nasser, Governor of Jazan Region, inspected the project, praising the quality of implementation and adherence to the schedule.

King Abdullah International Airport
Airport Project

A Marine-Inspired Design

The airport features an architectural design inspired by the marine environment, with its shell-like roof, reflecting the beauty of the Red Sea.

It includes a 57,000-square-meter passenger terminal equipped with 12 departure gates, 10 aircraft bridges, and 32 check-in counters.

It also includes 2,000 parking spaces, four waiting lounges, and a smart baggage handling system that can handle 400 bags per hour. Facilities include a duty-free shopping area, international restaurants, and a museum showcasing Jazan’s heritage.

King Abdullah International Airport: Supporting Economic Growth

With a capacity of 3.6 million passengers annually, the airport aims to meet the growing demand for travel.

It is located near Jazan Basic Industries City and the Aramco Refinery, enhancing its role in supporting industries and investments.

It consists of 39 expandable buildings, featuring sustainable technologies such as energy-efficient cooling systems and smart resource management, achieving 4.5 million work hours without a lost time injury.

King Abdullah International Airport .. 77% Complete
King Abdullah International Airport .. 77% Complete

King Abdullah International Airport: Supporting Tourism and Vision 2030

The airport is part of Vision 2030, promoting tourism through its proximity to the Farasan Islands and the waterfront.

It provides job opportunities for local talent, with training programs for Jazan’s youth, enhancing social development.

The airport also supports cultural and sporting events in the region, such as the Jazan Winter Festival, attracting visitors from within and outside the Kingdom.

Prince Mohammed bin Nasser has directed that work be accelerated to ensure the airport’s timely opening, making it a global gateway that reflects Jazan’s ambitions.

 King Abdullah International Airport: 77% Complete
King Abdullah International Airport: 77% Complete

Further Reading From ArchUp

  • |

    Definition of a house in the Mexican countryside by stone walls

    Definition of a house in the Mexican countryside by stone walls, Mexican country house designed by Mexico and Valencia architecture…

  • LANZA atelier Announced as Designer of the 2026 Serpentine Pavilion

    The Serpentine Galleries has selected LANZA atelier to design the 2026 Serpentine Pavilion, marking the 25th edition of the annual…

  • Tower Blocks reduce carbon footprint

    Crafting an interactive game design –  Korean global manufacturer Intops brilliantly launches innovative sustainable ‘Tower Blocks’ as a part of their Revive Project from recycled plastic and wood waste. “Today, people look beyond convenience for better products – they seek the joy of ownership. There is a great challenge in transforming good designs into functional objects and

  • Christian + Jade explores the Weight of Wood at 3 Days of Design

    Danish design studio Christian + Jade has created an exhibition in collaboration with wood flooring manufacturer Dinesen that explores the density of wood and its significance and history as a commodity. The Weight of Wood exhibition, which takes place at the Dinesen showroom as part of Copenhagen festival 3 Days of Design, was the result

Leave a Reply

Your email address will not be published. Required fields are marked *