Riese Pio X Water Tower Competition: Brief, Prizes and Review

Alto Trevigiano Servizi (ATS) is inviting proposals to rehabilitate its water tower and entrance grounds at Riese Pio X, in Italy’s Treviso area. The anonymous two-stage competition asks designers to give working water infrastructure an architectural identity while improving access, landscape and maintenance. The tower is approximately 32.57 metres high, with a tank of about 700 cubic metres. It remains operational infrastructure, and that fact should govern the design.
A tower and its operational landscape
The brief places equal practical importance on the vertical landmark and the ground around it. The entrance must accommodate pedestrians, cyclists, ordinary vehicles and maintenance operations. The existing road access is to lose its vehicle function, while vehicle access is reorganized through the adjoining development. Electrical cabins remain fixed, wells need maintenance access, and crane or tanker manoeuvres cannot be treated as occasional exceptions that landscaping may obstruct.
The design is also intended as a pilot approach for other ATS water towers. Replicability does not necessarily mean repeating the same decorative enclosure. A useful prototype might establish adaptable components, inspection clearances and a maintenance strategy that can respond to different structural configurations and settings.
Competition essentials
| Organizer | Alto Trevigiano Servizi S.p.A. |
| Format | Anonymous, two stages; five proposals advance |
| Stage-one deadline | 14 December 2026, 11:00 UTC |
| Stage two | 8 February–10 March 2027, closing at 11:00 UTC |
| Final ranking | Scheduled for 5 May 2027 |
| Language | Italian |
| ANAC contribution | Participants are exempt |
| Works budget | approximately USD 934,065 for the competition intervention |
The professional and economic-operator eligibility requirements appear in section 3.1 of the rules. Registered professionals and qualifying organizations must satisfy the applicable procurement conditions. Applicants outside Italy should verify their professional recognition and administrative route before committing design time; this is not a student competition or a blanket invitation to every unregistered designer. No organized site visit is provided for in the rules.
Stage one requires one landscape A1 board, submitted as a PDF of up to 20 MB, and a separate text-only A4 report of no more than two pages and 8,000 characters including spaces, in a PDF of up to 10 MB. The board may contain no more than two three-dimensional representations. Entrants must use the official template and preserve anonymity, including in file metadata. These limits favour a clear argument supported by a convincing site plan rather than a large set of atmospheric views.
Prizes and subsequent obligations
| First | approximately USD 52,993 |
| Second | approximately USD 9,341 |
| Third | approximately USD 5,714 |
| Fourth | approximately USD 4,396 |
| Fifth | approximately USD 3,261 |
| Total | approximately USD 75,704 |
Awards exclude professional social charges and VAT, and require a second-stage score of at least 40/100. The winner must develop the technical and economic feasibility project within the period set by the rules and calendar. A later executive-design appointment depends on funding and the stated procurement conditions. Neither the construction budget nor the total procurement value should be advertised as the winner’s cash prize.
What the jury will assess
The official calendar places publication of jury names on 17 December 2026, after the first submission closes. The first-stage criteria allocate 40 points to the entrance, its relationship with the tower, parking, water management and greenery; 35 to tower integration, durability, safety and related operational concerns; and 25 to composition and originality. The landscape and working ground plane therefore carry more weight than a standalone sculptural image.
At stage two, contextual and landscape integration receives 35 points, architectural quality and originality 30, functional flexibility and maintenance 20, economic feasibility 10, and replication potential five. A team should distinguish the brief’s strategic ambition for a repeatable model from the smaller explicit score assigned to that criterion.
Document review: three consequential clarifications
First, a separate seismic-strengthening project will change the existing tower. The competition brief prefers working with the strengthened structure. Official answers explain that the approximately USD 934,065 competition budget excludes the separate seismic intervention, but includes the competition works’ safety measures and temporary works. Teams cannot assume free access to scaffolding from the other project. This affects both detailing and cost planning.
Second, the entrance grounds are private. Published answers 8 and 17 clarify restricted public access outside working hours and access for authorized activities. Answer 16 allows the possibility of educational visits or organized events after refurbishment. An attractive civic frontage must therefore coexist with controlled access; calling it an unrestricted public plaza would misrepresent the brief.
Third, answer 51 confirms that the competition concerns the tower from ground level to the top, resolving uncertainty raised about whether intervention was limited to the shaft. Rescue equipment, hatches and guardrails remain constrained by safety requirements. November additions include structural information and further technical drawings; teams should read these alongside the latest Q&A rather than design solely from photographs.
ArchUp assessment: infrastructure needs more than a new skin
This is a valuable architectural problem because it brings an everyday utility into public view without pretending that its technical purpose has disappeared. The most convincing design would make access, drainage and the tower’s visual role legible together. A façade treatment that looks coherent from the road but obstructs inspection or adds difficult-to-clean surfaces would miss the operational brief.
A key design test is the relationship between enclosure and maintenance. Openings, secondary supports and access routes should demonstrate how equipment can be serviced and components replaced. Added mass and wind exposure require coordination with the structural information. The official clarifications are design inputs, not substitutes for project-specific verification of a proposed cladding system.
The financial challenge is also specific: work at height, access equipment and construction sequencing can consume a significant share of a modest intervention budget. A repeatable system is more persuasive when its replacement and inspection logic is clear, rather than when identical panels are simply repeated across a rendering. For teams experienced in infrastructure, retrofit and landscape coordination, the brief offers a focused professional opportunity. For a practice seeking an unconstrained landmark commission, the operational obligations are substantial.
Rights and review scope
The rules provide for acquisition of the winning project on payment while retaining authors’ copyright and intellectual-property rights. The organizer may publish proposals after the competition with attribution and no additional payment. ArchUp reviewed the official rules, design brief, calendar and relevant Q&A on 17 November 2026; this is an editorial review, not an inspection or structural certification. Image: official ATS competition banner.

ArchUp Editorial Committee — Editorial Note
Compare other opportunities: Guido Reni School Competition in Padova: Brief, Prizes and Review; CarlottaxArchitettura 2027: Eligibility, Jury and Award Review.
Converted amounts are approximate US-dollar equivalents using reference rates dated 17 November 2026 (ECB). The organizer’s original-currency amounts govern payment; rounding may cause small differences in totals.
Time remaining for submission
Stage-one submission closes on 14 December 2026 at 11:00 UTC.
Official competition page
Read the official call, full brief, forms and any organizer updates before entering.






