Saudi Designs Law sets 15-year protection and clarifies workplace design rights
Saudi Arabia published its Designs Law in Umm Al-Qura on 27 November 2026, setting out registration, ownership and enforcement provisions. It takes effect 180 days after publication, rather than immediately.
Registration requires a new, distinctive design that is not solely functional or technical. Certificate protection lasts 15 years from filing. Applicants other than the designer must identify the designer and the basis on which the right was transferred.
Ownership within the practice
Article 18 addresses employer ownership in specified employment circumstances, unless otherwise agreed. It also gives the employee who developed the design a special remuneration entitlement, determined by agreement or by the court in a dispute. An agreement removing that entitlement is invalid. The designer’s name remains on the certificate after ownership changes.
What changes for design practices?
The professional implication is a need to document contributions, assignments and collaboration terms. Delivering a drawing does not, by itself, explain the extent of the rights transferred. Nor should the law be presented as automatically protecting every architectural plan or engineering solution. Eligibility and the forthcoming implementing regulations require separate examination.
✦ ArchUp Editorial Insight
The value of design begins in the allocation of rights before it appears in a finished product. A practice working through employees, independent collaborators and manufacturers may have a contribution chain more complicated than the credit printed on its presentation. Our reading is that the new framework makes record keeping part of project management: identifying the author, defining the commission, retaining development records and documenting assignments. Client approval and ownership of every possible use should not be treated as interchangeable concepts. Registration also cannot be assumed to resolve every contractual dispute or cover every building component. The practical question is which party must make the application, maintain the record and carry the cost of protecting the work. Those decisions can influence how a product is licensed, repeated and supplied long after its first commission. The architectural consequence therefore begins in procurement and agreements, before it becomes visible in the shape or specification of a manufactured element.
Source: Umm Al-Qura, Designs Law, 27 November 2026, Articles 3, 7, 17, 18, 20 and 48.






