Espace Riopelle opens in Quebec City with visible storage and conservation spaces

Espace Riopelle – Michael Audain Pavilion has entered its opening sequence at the Musée national des beaux-arts du Québec. A media event with a ribbon cutting is scheduled for 21 October 2026, followed by the public opening programme from 22 to 25 October. The change is operational as well as ceremonial: a new museum building is moving from construction and installation into public use.
The three-storey pavilion exceeds 5,000 square metres and was designed by Les architectes fabg. It will present more than 130 works spanning over five decades of Jean Paul Riopelle’s career, alongside a new display of Québec modern art. The building also adds a café, shop, multipurpose room and facilities for school groups.
A museum shaped by collection care
The architectural programme links public display with work that usually remains backstage. A visible art store and a restoration laboratory make collection care part of the visitor’s understanding of the institution. A circular gallery is dedicated to Tribute to Rosa Luxemburg, while 17-metre-high spaces, spruce ceilings, glass walls and two covered terraces frame the collection against the Plains of Abraham and the St. Lawrence River.
The zinc roof, timber-lined interiors and landscape references are documented design features. ArchUp’s interpretation is that the project treats storage, conservation and viewing as one continuous museum system rather than separating the public gallery from the institution’s technical work.
The museum reports a project budget of CAD 84 million, supported by the Québec government, the City of Québec, the museum foundation and private philanthropy. The opening confirms that the facility is entering service; any longer-term effect on attendance or the surrounding cultural district will require evidence from its operation after launch.






